Marina Mall Ghana Safety & Loss Prevention

(Ghana) Marina Mall & Tower

DNP Systems has been awarded contract for engineering, design, procurement, installation, testing & commissioning for FM200 fire supression system for Electrical and control rooms@ the new marina mall in Ghana – Accra. 
  • Main Electrical Room Volume: 380 CBM
  • Basement Control Room Volume: 48 CBM
  • Basement Electrical Room Volume: 42 CBM
  • GF Control Room Volume: 96 CBM
  • GF Electrical Room Volume: 45 CBM